ServicesWorld Taekwondo equipment testing

World Taekwondo equipment testing

Since 2023 we have been World Taekwondo's official laboratory for PSS compliance testing. We test your electronic scoring system against WT's guidelines and send a signed report to WT, which decides on homologation.

Since2023

Official World Taekwondo laboratory for PSS compliance testing

For manufacturers of Protector Scoring Systems (PSS) who need WT homologation. The same kick should give the same score, on every protector, in every match: that is what we measure, impact by impact, against the World Taekwondo PSS Compliance Test Guidelines.

What we test

  1. Architecture, scoring, reliability and safety of the scoring system.
  2. Body protectors, head protectors, transmitters, receiver and match software, and the sensor gloves and socks for the techniques tested.
  3. Repeatability, linearity, missed hits and uniformity, measured on every impact.
  4. The firmware and calibration actually loaded on your units, checked against what you declared.

Good to know

Failed test: one re-test free of charge within 6 months, with the same scope. Every change must be declared. Development pre-tests. Before the official application, we test your prototype on the same rig and with the same software used for compliance tests. You receive a general assessment of where the product stands and our recommendations. A pre-test gives no official result and is not a homologation test. Available to every manufacturer on the same terms; quoted on request.

How to request a test

  1. Fill in the application form: company, contacts, the equipment, sizes, and the test you need (first homologation, re-test with your Test ID, or development pre-test).
  2. We reply with a Test ID and the list of material and documents to send: manuals and procedures in English, and the Application Form with your declarations of firmware, match software and calibration versions.
  3. You ship the equipment. Payment is due before the test starts.
  4. The standard test is completed within 10 working days from receipt of the equipment and payment, and you have the results within 2 working days of completion.
  5. The signed report goes to World Taekwondo, which takes the homologation decision.
Schematic of the drop-test rig: release, guide rails, drop weight, impactor with glove or sock, light gates, protector, foam backing.
The drop-test rig: a standard weight falls from a calibrated height onto the protector, and light gates measure the speed of every drop.Illustrative example

Illustrative examples

What the numbers show

  • Illustration: a calibrated weight dropped at four energies, the same every time; the reported hit level scatters around an average that rises along a straight line with the impact energy.
    Every drop, every energy. Each dot is one calibrated drop on the protector; the line shows the average level.Illustrative example
  • Illustration: hit level rising in a straight line with impact energy.
    The hit level rises along a straight line as the impact energy increases.Illustrative example
  • Illustration: body protector with 16 test points, all reading about the same hit level.
    Uniformity: the same impact should score the same anywhere on the protector, on all 16 test points.Illustrative example

Apply for a PSS compliance test

Tell us your system, the sizes and the techniques to test: we reply with the documents we need and the next steps.

Contact us

Tell us what you need. We read every message and reply in English, 한국어, Italiano, 日本語, Русский.

What can we help with?
Consents

How we handle your data: privacy policy